Building envelope renovation

Detached house near Augsburg, built 1968 – windows first, then the whole envelope

Location
Near Augsburg
Year built
1968
Scope
Windows, facade, top-floor ceiling
Duration
Two stages over 14 months

Example project – will be replaced by a documented client project.

Starting point

Taken over from the parents

A hip-roofed house from 1968, around 140 m², taken over from the owners' parents. The walls: 30 centimetres of perforated brick, uninsulated. The windows dated from the early 1990s, it was noticeably cold below the window sills in winter, and the heating bills rose every year. The owners wanted to stay long term – but not to pay for everything at once.

Brief

The envelope, in two stages

We carried out the building survey, set the sequence and executed both stages: windows and front door first, facade and top-floor ceiling insulation a year later. Deliberately not included: the heating – the 2016 boiler is sound and will only be replaced at the end of its service life, sized then for the insulated envelope.

Bausachverständiger misst mit einem Zollstock die Tiefe einer alten Fensterlaibung, helles Tageslicht auf Holzrahmen und Fensterbank
Measure first, then order. Every opening was measured individually – the dimensions of 1968 rarely match the construction drawings.

Decisions

Windows in a plane that did not yet exist

The most important decision came before the first tool was picked up: the new windows were not set into the old reveals but in front of the wall – in the plane of the insulation that would not arrive until a year later. Doing everything in one go was also considered; the budget argued against it, and the planned sequence made splitting the work harmless. On the roof, the decision went against re-tiling: the 1998 tiles are watertight, so the top-floor ceiling was insulated instead – the greatest effect for the least money.

Luftdichter Fensteranschluss im Makro-Panorama: Anschlussband und Dichtstofffuge vor hellem Putz im streifenden Sonnenlicht
The junction ahead of the facade. The windows were sealed airtight in the first stage – in the plane where the insulation arrived a year later.

Execution

Two stages, occupied throughout

Stage one in autumn: 16 windows and two doors, replaced room by room within a week, with the house remaining occupied. Stage two the following summer: scaffolding, 16 centimetres of facade insulation, new window sills, blown-in insulation on the top-floor ceiling. Between the stages the windows sat visibly proud of the wall – protected with temporary flashings at the junctions.

Mineralwolldämmung fugenlos an den Holzrahmen des Fensters gepresst, klares Tageslicht auf der Fuge
Insulation right up to the frame. Because the windows already sat in the insulation plane, the boards meet the frames without a thermal bridge.

Outcome

What it achieved – and what was difficult

The cold corners below the window sills are gone, and the first winter after the facade was the first in which the living room got warm without an extra fan heater. What was difficult was the year in between: a house with new windows in front of an uninsulated wall looks unfinished, and the temporary flashings had to be adjusted twice. At the plinth, damp masonry also came to light when the scaffolding went up – the drying-out extended the second stage by three weeks.

Eingerüstetes Haus unter hellem Mittagshimmel, Dämmplatten im präzisen Raster halb aufgebracht, davor ebener heller Vorplatz
Four layers, one sequence. Old render, insulation board, reinforcement, top coat – each layer presupposes that the one beneath it has been checked.
Year built
1968
Carried out
2023 – 2024, two stages
Trades
Windows & Doors, Facade & Insulation, top-floor ceiling
Scope
The complete envelope: 16 windows, two doors, around 180 m² of facade
Occupied during the works
Yes, throughout

Let’s talk about your project.

The initial consultation is no-obligation. If we are not the right partner for your project, we will tell you so.

Porträt: Ihr Ansprechpartner Daniel Braun im weißen Hemd vor hellgrauem Hintergrund

Daniel Braun

Your point of contact

When you call or write, he is the one you reach. He takes down what needs doing and gets back to you – even if the answer is that we are not the right firm for the job.

Your project

What happens after your enquiry

  1. A reply within 24 hours on working days.
  2. A short phone call – is the project a good fit for us?
  3. An on-site visit with a building survey.

This website sets no cookies – neither its own nor those of third parties. There is no tracking, there are no analytics tools and no advertising pixels.

So that the site behaves correctly as you click through, your browser remembers three items in session storage:

What is stored

feb-gate-done
whether you have already seen the entrance screen
feb-audio
whether sound is on or off
feb-audio-time
where the audio track has got to

These items never leave your device, do not identify you, and are deleted as soon as you close the tab. Because they serve only the function you triggered yourself, no consent is required for them.